Thank you — your enquiry is in
A carport surveyor has your details and will reply by email within one working day. No phone tag, no pushy follow-up — and we will tell you straight if a rooftop array or a PPA is the better first move for your site.
What happens next
- 1. A quick read of your site (1 working day). We look at your rough bay count, location and sector, and come back with an indicative system size, an install-cost range (per space and per kWp, ex VAT) and an early read on your DNO grid position.
- 2. A site survey and fixed quote — only if it stacks up. If the numbers look right for you, we survey the ground conditions, confirm the foundation type and the Class OA planning route, and issue a fixed, itemised proposal. You can stop at any step.
- 3. Consents and install. On a go-ahead we run the Class OA prior approval and the DNO G99 application in parallel, then groundworks, steel, PV and commissioning — phased so your car park keeps trading.